Train-delay-analysis

Abstract

Despite the fact that punctuality is an advantage of rail travel compared with other long-distance transport, train delays often occur. For this study, a dataset of weather, train delay and train schedule records were collected and analyzed in order to understand the patterns of train delays and to predict train delay time. We found that in severe weather train delays are determined mainly by the type of bad weather, while in ordinary weather the delays are determined mainly by the historical delay time and delay frequency of trains. Identifying the factors closely correlated with train delays, we developed a machine-learning model to predict the delay time of each train at each station. The proposed prediction model is useful not only for passengers wishing to plan their journeys more reliably, but also for railway operators developing more efficient train schedules and more reasonable pricing plans.

Scope and objectives

  • To develop a methadology that can predict train delays.
  • To select an appropriate Platform for implementing the code.
  • Perform the exploratory analysis on the train delay data.

Results

  • Forecasted Data Points

alt text

  • Forecasted Data Samples Overlapped over Original Samples

alt text

Conclusion

In the study, we proposed a novel approach that sequentially concatenates a machine learning algorithm with a statistical model, i.e. PROPHET. This approach is able to consider both network-scale spatial-temporal correlations among traffic flows and location specific traffic characteristics. Its postprocessing by the ARIMA analysis can extract traffic features from the residuals of Neural Network, hence, significantly improve the accuracy of prediction. In addition, this approach is also able to capture the sharp nonlinearity of traffic flows. In the context of using seven years long railway traffic time series data set, the case study provides numerical evidence that the predictive capacity of the proposed prophet model. It is an effective and efficient tool for delay forecasting prediction. It is noteworthy that the MSE is significantly reduced in the comparison of ARIMA. It clearly reflects the important role of network-wide spatial correlations in traffic prediction. It is beneficial if the network traffic flows are treated as a whole in the prediction. The postprocess significantly improves the accuracy of delay prediction. In the future research, the proposed approach may be applied to traffic prediction for a large dataset over a wide range of trains if data is available. It may also be compared with those preprocess machine learning algorithms.

Acknowledgment

We would like to express my special thanks of gratitude to RDSO, who facilitated this project and provided us with key points and guidance for the same.

train-delay-analysis's People

Contributors

ramesht007 avatar

Stargazers

 avatar  avatar  avatar  avatar

Watchers

 avatar  avatar

Recommend Projects

  • React photo React

    A declarative, efficient, and flexible JavaScript library for building user interfaces.

  • Vue.js photo Vue.js

    ๐Ÿ–– Vue.js is a progressive, incrementally-adoptable JavaScript framework for building UI on the web.

  • Typescript photo Typescript

    TypeScript is a superset of JavaScript that compiles to clean JavaScript output.

  • TensorFlow photo TensorFlow

    An Open Source Machine Learning Framework for Everyone

  • Django photo Django

    The Web framework for perfectionists with deadlines.

  • D3 photo D3

    Bring data to life with SVG, Canvas and HTML. ๐Ÿ“Š๐Ÿ“ˆ๐ŸŽ‰

Recommend Topics

  • javascript

    JavaScript (JS) is a lightweight interpreted programming language with first-class functions.

  • web

    Some thing interesting about web. New door for the world.

  • server

    A server is a program made to process requests and deliver data to clients.

  • Machine learning

    Machine learning is a way of modeling and interpreting data that allows a piece of software to respond intelligently.

  • Game

    Some thing interesting about game, make everyone happy.

Recommend Org

  • Facebook photo Facebook

    We are working to build community through open source technology. NB: members must have two-factor auth.

  • Microsoft photo Microsoft

    Open source projects and samples from Microsoft.

  • Google photo Google

    Google โค๏ธ Open Source for everyone.

  • D3 photo D3

    Data-Driven Documents codes.